BIRMINGHAM
SCOPE OF WORK
GALLERY
CCL delivered the following benefits:
Faster Construction
Removal of downstand beams greatly facilitated the installation of formwork.
Material Savings
Elimination of most downstand beams resulted in a significant reduction in concrete volumes and reinforcement quantities.
Improved Buildablitly
A predominantly flat soffit enabled easier routing of services, speeding up construction.
Increased Ceiling Height
Reduction of slab thickness maximised the floor to ceiling space.
Increased Usable Space
Fewer downstand beams resulted in more open, expansive spaces.
Cost Effective Design
The reduction in build time resulted in significant savings.