Hotel La Tour

BIRMINGHAM

A 174 bedroom, four star hotel in birmingham, featuring a CCL post-tensioned transfer deck at level 3, supporting the five-storey precast concrete structure above.

  • SCOPE OF WORK

    Hotel La Tour

    • Design and installation of post-tensioned suspended floor plate to level 2.
    • Design and installation of post-tensioned transfer slab to level 3.
    • Central 80 mm recess strips incorporated into both slabs to accept precast bathroom pods.
    • Creation of large service openings in levels 2 and 3.
  •  
  • GALLERY

    Hotel La Tour

  • Image Thumbnail
    Image Thumbnail
  • Image Thumbnail
  • Image Thumbnail

BENEFITS

CCL delivered the following benefits:

  • schedule

    Faster Construction

    Removal of downstand beams greatly facilitated the installation of formwork.

  • vertical_align_bottom

    Material Savings

    Elimination of most downstand beams resulted in a significant reduction in concrete volumes and reinforcement quantities.

  • view_quilt

    Improved Buildablitly

    A predominantly flat soffit enabled easier routing of services, speeding up construction.

  • vertical_align_top

    Increased Ceiling Height

    Reduction of slab thickness maximised the floor to ceiling space.

  • open_with

    Increased Usable Space

    Fewer downstand beams resulted in more open, expansive spaces.

  • check

    Cost Effective Design

    The reduction in build time resulted in significant savings.