PLYMOUTH ROAD BRIDGE

BLACKPOOL

Raising the three-span road over rail bridge by 800 mm involved replacement of existing bridge superstructure including deck, bearings, bearing shelves and parapets.

  • SCOPE OF WORK

    PLYMOUTH ROAD BRIDGE

    • Bridge inspection.
    • Review of original bearing schedules.
    • Design of bearing solution and advice on bearing suitability.
    • Design of two types of bespoke bearings.
    • Manufacture of bearings.
  •  
  • GALLERY

    PLYMOUTH ROAD BRIDGE

  • Image Thumbnail
    Image Thumbnail
  • Image Thumbnail
  • Image Thumbnail

BENEFITS

CCL delivered the following benefits:

  • trending_down

    Reduced Cost

    CCL reduced the number of bearing types from six to two providing a more cost-effective solution.

  • trending_up

    Efficiency

    Reducing the number of bearing types simplified the installation process.

  • schedule

    Faster Construction

    Prompt delivery of bearings enabled installation ahead of schedule.

  • assignment_turned_in

    Reliability

    CCL’s punctual manufacture and delivery program ensured tight installation windows were hit.