CCL delivered the following benefits:
Bespoke Strengthening
Controlled movement of above-ground structure during construction to protect retained facades. Support of above-ground structure during and post construction.
Specialised Solution
Overcame logistical issues of transportation and installation of steel in restricted location.
Design Flexibility
Longer spans (32 ft) and fewer columns (reduced to two columns) to create 14 parking bays and facilitate vehicle movement.
Extra Space
Increased headroom for added vehicle clearance.
Faster Construction
Our specialised design saved 6 months due to no underpinning.
Cost Savings
Less steel and reduced foundations resulted in significant savings.