CCL delivered the following benefits:
Safety-First Design
Building on top of an existing skyscraper required extensive safety measures.
Specialised Solution
Clients vision of 20-metre-high void below transfer structure achieved.
Deflection Reduction
Utilisation of post-tensioning enabled mid-span deflections to be controlled within allowable tolerances.
Vibration Control
Mitigating vibration response factors were a key consideration in reaching a compliant design solution.
Cost Effective Design
Post-tensioned box girder transfer beams were considered to be the most cost-effective solution for bridging the 52 m clear span.
Improved Efficiency
Installation time was significantly reduced using a post-tensioned solution, allowing the construction programme to be condensed.