CCL delivered the following benefits:
Material Reduction
Reduced slab thickness across both wings (400 mm to 275 mm and 300 mm).
Specialist Design
Adapted design and reinforcement detailing to avoid requirement for a permanent movement joint through the structure.
Design Flexibility
Integrated soft spots in roof to provide flexibility for rooftop plant.
Vibration Control
Detailed vibration assessments to ensure compliance with specified performance criteria.
Faster Construction
CCL’s specialised solution significantly sped up construction.
Cost Savings
The reduction in build time resulted in significant savings.