BEIRUT
SCOPE OF WORK
GALLERY


CCL delivered the following benefits:
Specialist Solution
Engineered solution to achieve architectural vision.
Stronger Structure
Cantilevered beam supporting construction of seven storeys above.
Deflection Control
Specialist construction techniques reduced deflection in critical areas.
Design Consistency
Consistent floor-to-floor heights were maintained despite changes in geometry and loadings at each level.
Cost Savings
The reduction in build time resulted in significant savings.
Faster Construction
CCL’s specialised solution significantly sped up construction.