CHISWICK PARK

LONDON

A 1.8 million sq ft award winning workplace in west London, based around the Enjoy-Work philosophy.

  • SCOPE OF WORK

    CHISWICK PARK

    • In-situ post-tensioned slabs with precast edge beams combined with precast columns simplified buildability.
    • Hybrid concrete construction resulted in high quality finishes, flexibility and reduced costs.
    • Combination of precast and post-tensioned concrete moved part of the site work to the factory accelerating the construction program.
    • Central stability stair core provided free lateral movement to eliminate need for anti-crack reinforcement or temporary movement joints.
    • Repetitive layout using precast columns and edge beams which acted as permanent formwork also reduced costs and minimized construction time.
    • Design and installation of post-tensioned floor plates over 10 levels.
    • Design of reinforced concrete core slabs and precast edge units.
  •  
  • GALLERY

    CHISWICK PARK

  • Image Thumbnail
  • Image Thumbnail
    Image Thumbnail
  • Image Thumbnail

BENEFITS

CCL delivered the following benefits:

  • show_chart

    Crack Control

    Central core eliminated the need for anti-crack reinforcement.

  • layers

    High Quality Finish

    PPT and precast elements provided an outstanding finish.

  • schedule

    Faster Construction

    Slashed construction time using precast and post-tensioned concrete.

  • public

    Less CO2

    Post-tensioning reduced the concrete required and lowered CO2 emissions.

  • view_quilt

    Improved Buildability

    Combining specialist techniques improved the building design.

  • check

    Cost Savings

    Precast edge beams acting as permanent formwork reduced costs.