SHEFFIELD
SCOPE OF WORK
GALLERY

CCL delivered the following benefits:
Reduced Slab Depth
Reduced overall slab depth from 500 mm to 350 mm.
Deflection Control
Minimised the risk of damage to glazing or costly aluminium cladding.
Faster Construction
CCL's specialised solution significantly sped up construction.
Specialist Solution
Achieved design feature aligned to the architect’s vision.
Increased Ceiling Void
Increased ceiling void to improve coordination of building services installation.
Reduced Cost
CCL helped save the University a huge £750,000 in total.