SHOPPING MALL

AL RAYYAN, QATAR

Prior to handover of the Doha mall fire broke out damaging 4,700 m² of post-tensioned and hollowcore slabs and beams.

  • SCOPE OF WORK

    SHOPPING MALL

    • On-site investigation into extent of structural damage.
    • Jack-force testing of post-tensioned strands.
    • Grout inspection of exposed tendons.
    • Design of strengthening solution to mitigate the effects of the fire.
    • Removal of soot, dirt and unsound concrete.
    • Refurbishment of damaged slabs using hand-application, sprayed concrete and form and pump technique.
    • Additional passive reinforcement installed.
    • Installation of carbon fibre plates and wraps.
  •  
  • GALLERY

    SHOPPING MALL

  • Image Thumbnail
    Image Thumbnail
  • Image Thumbnail
  • Image Thumbnail

BENEFITS

CCL delivered the following benefits:

  • schedule

    Rapid Response

    CCL worked in parallel with the site team to ensure the opening of the mall was not delayed.

  • build

    Bespoke Repairs

    Refurbishment carried out using a variety of techniques to address specific issues.

  • check

    Peace of Mind

    Rigorous testing of affected areas to accurately diagnose extent of damage.