CCL delivered the following benefits:
Longer Spans
Post-tensioning achieved longer, thinner spans.
Crack Control
Post-tensioned slabs provided deflection and crack control.
Faster
Each post-tensioned floor took just one week to install.
Less CO2
Post-tensioning reduced the volume of concrete required by 2000 m³.
Extra Space
Post-tensioning resulted in a whole extra floor of usable space.
Cheaper
The reduction in concrete and build time resulted in significant savings.